How is the G&A base determined?

How is the G&A base determined?

You never choose the G&A base. Rate Studio derives it from your routing choices.

How it is derived

  • With no MSOH, the base is Total Cost Input.
  • Turn on MSOH and route costs to it, and the base becomes Value Added.
  • G&A is always calculated last. Its pool is G&A labor and expenses, with applied fringe and applied intermediate cost, plus the B&P and IR&D pools. There is nothing to configure.

What puts a cost in the G&A base

  • A cost routed to an overhead base is also in the G&A base automatically.
  • A cost routed to MSOH reaches G&A only through the MSOH pool total, never as raw dollars.
  • A cost routed to G&A only goes straight into the G&A base.

Where to see it

Scroll to the G&A section of Configure Structures to see the base type your routing produced. To change it, change the routing (How do I route materials, subcontracts, travel and ODC?) or the MSOH choice (Should I use an MSOH pool?).

If this doesn't work: if the base is not what you expected, review the routing table for each overhead pool, then see My calculated rate doesn't match what I expected.

Watch: Routing materials, subcontracts, travel and ODC, the G&A base from 1:52

Full guide section: Configure Structures

Related: How do I route materials, subcontracts, travel and ODC? | Should I use an MSOH pool? | How do I set up overhead pools and their allocation bases?