You never choose the G&A base. Rate Studio derives it from your routing choices.
Scroll to the G&A section of Configure Structures to see the base type your routing produced. To change it, change the routing (How do I route materials, subcontracts, travel and ODC?) or the MSOH choice (Should I use an MSOH pool?).
If this doesn't work: if the base is not what you expected, review the routing table for each overhead pool, then see My calculated rate doesn't match what I expected.
Watch: Routing materials, subcontracts, travel and ODC, the G&A base from 1:52
Full guide section: Configure Structures
Related: How do I route materials, subcontracts, travel and ODC? | Should I use an MSOH pool? | How do I set up overhead pools and their allocation bases?