Choose the number of overhead pools, name each one, then pick each pool's allocation base. The base is the denominator of the overhead rate.
Each overhead pool collects overhead labor, overhead expenses, the applied fringe on that labor, and any intermediate pool cost allocated to it.
Bid and proposal (B&P) labor and IR&D labor, with their applied fringe, bear overhead like direct labor. Each of those dollars is tagged to the one overhead pool it bears cost from when you enter cost data, so it sits only in that pool's base.
Below each base is the routing table for materials, subcontracts, travel and other direct costs. See How do I route materials, subcontracts, travel and ODC?.
If this doesn't work: if Data Requirements shows red items after you add pools, see Calculation is blocked: what data is missing?.
Watch: Overhead pools and bases, from 0:14
Full guide section: Configure Structures
Related: How do I route materials, subcontracts, travel and ODC? | How do I set up fringe? | How are B&P and IR&D treated?