B&P and IR&D are quasi-direct costs. On Configure Structures you choose whether the organization has B&P, IR&D, both or neither.
How they are treated
- Labor: B&P labor and IR&D labor, with their applied fringe, bear overhead like direct labor.
- One pool each: each of those dollars is tagged to the one overhead pool it bears cost from, when you enter cost data. It sits only in that pool's base.
- G&A: the B&P and IR&D pools are part of the G&A pool, which is calculated last (see How is the G&A base determined?).
Where you set it
- On Configure Structures, finish the structure and choose B&P, IR&D, both or neither.
- In Enter Cost Data, tag B&P and IR&D labor lines to the overhead pool they bear cost from (see How do I enter cost data manually?).
Glossary
B&P / IR&D stands for Bid & Proposal / Independent Research & Development, quasi-direct costs under CAS 420 that bear overhead like a direct cost but flow into the G&A pool.
If this doesn't work: if Data Requirements shows red items, see Calculation is blocked: what data is missing?.
Watch: MSOH and G&A, B&P and IRAD from 2:47
Full guide section: Glossary