How are B&P and IR&D treated?

How are B&P and IR&D treated?

B&P and IR&D are quasi-direct costs. On Configure Structures you choose whether the organization has B&P, IR&D, both or neither.

How they are treated

  • Labor: B&P labor and IR&D labor, with their applied fringe, bear overhead like direct labor.
  • One pool each: each of those dollars is tagged to the one overhead pool it bears cost from, when you enter cost data. It sits only in that pool's base.
  • G&A: the B&P and IR&D pools are part of the G&A pool, which is calculated last (see How is the G&A base determined?).

Where you set it

  1. On Configure Structures, finish the structure and choose B&P, IR&D, both or neither.
  2. In Enter Cost Data, tag B&P and IR&D labor lines to the overhead pool they bear cost from (see How do I enter cost data manually?).

Glossary

B&P / IR&D stands for Bid & Proposal / Independent Research & Development, quasi-direct costs under CAS 420 that bear overhead like a direct cost but flow into the G&A pool.

If this doesn't work: if Data Requirements shows red items, see Calculation is blocked: what data is missing?.

Watch: MSOH and G&A, B&P and IRAD from 2:47

Full guide section: Glossary

Related: How do I set up overhead pools and their allocation bases? | How is the G&A base determined? | How do I enter cost data manually?