My calculated rate doesn't match what I expected

My calculated rate doesn't match what I expected

Start with the three most common sources of a mismatch.

What to check

  1. An input on the wrong side of a base exclusion. Review the routing table for each overhead pool and confirm where each non-labor cost goes (see How do I route materials, subcontracts, travel and ODC?).
  2. A cost element missing from a base it should be in. Check the Rate Summary and the cascade detail for the pool, and see how the G&A base was derived (see How is the G&A base determined?).
  3. A recent GL account addition that hasn't been reflected in your pool setup. Review your account mappings (see How do I map categories and review account mappings?).

Also check that the reconciliations show green (see What do the reconciliation checks mean?).

Still doesn't match

Contact support with your saved file so we can look at the specific structure. Use the Report a Bug or Error category if you think it is a bug and not a data problem (see How do I contact support, report a bug or request a feature?).

This article explains how to find the cause. It does not say whether a rate is correct for your business.

If this doesn't work: contact support (How do I contact support, report a bug or request a feature?).

Watch: Calculate and reconcile, from 0:45

Full guide section: Calculate & Reconcile

Related: What do the reconciliation checks mean? | How do I route materials, subcontracts, travel and ODC? | How do I contact support, report a bug or request a feature?