When should I use more than one fringe pool, and which fringe base should I pick?

When should I use more than one fringe pool, and which fringe base should I pick?

One fringe pool is standard. Use more than one only when labor has to be split by class.

When to split

  • The common, defensible splits are SCA and non-SCA, or union and non-union.
  • Name each pool to match your labor classes.
  • Other splits are allowed, but Rate Studio asks you to be ready to document the reason.
  • A split needs real data to support it. When fringe is split, every labor line in your cost data needs a fringe pool, and each overhead pool chooses which fringe pool applies to its labor (see How do I set up overhead pools and their allocation bases?).

Your plan sets how many fringe pools you can use (see What are my plan limits? (tiers vs. editions)).

Which fringe base

  • Total W-2 labor dollars is the most common.
  • Direct labor dollars only is the alternative.
  • The two hours-based options need hours from outside the general ledger, so Rate Studio flags them with a warning.

Embedded fringe

Fringe embedded in overhead is rare. There is no fringe rate, and the fringe costs sit inside the overhead pool.

If this doesn't work: if Data Requirements shows red items after you split fringe, see Calculation is blocked: what data is missing?.

Watch: Fringe and intermediate pools, from 0:47

Full guide section: Instructions screen

Related: How do I set up fringe? | How do I set up overhead pools and their allocation bases? | What are my plan limits? (tiers vs. editions)