Rate Studio's nine steps at a glance

Rate Studio's nine steps at a glance

Rate Studio walks you through nine steps in order. Later steps unlock as you finish earlier ones.

StepWhat happens
1. Mode & PurposeChoose your mode and enter company information (see How do I set up a new file?).
2. StructuresName each structure you are building (see How many structures do I need, and how do I name them?).
3. Configure StructuresBuild each structure's rate design: fringe, intermediate pools, overhead, MSOH, G&A, unallowables and B&P/IR&D. One tab per structure.
4. Data RequirementsSee what level of data detail your choices require before you enter any (see What do the Data Requirements and Configuration Summary screens show?).
5. Configuration SummaryA full summary of cost element routing and the computation cascade, and a good place to save.
6. Enter Cost DataUpload a trial balance or enter costs manually. Shared by every structure and entered once.
7. Calculate & ReconcileRates, full cascade detail, reconciliation checks and Excel/PDF exports.
8. Pricing & ComparisonContract pricing: burdened cost and fee for a contract cost mix, compared across structures.
9. HiringThe maximum salary you can offer, given a billing rate and target profit.

Optional: the Budget Module

If your data type is Budget and you build the budget from scratch, six extra screens appear between Configuration Summary and Enter Cost Data (see What is the Budget Module, and when do I use it?).

Plan and scope

Which modes and how many pools you can use may depend on your plan (see What are my plan limits? (tiers vs. editions)). Rate Studio is for modeling and strategy only (see What is Rate Studio, and what is it not?).

If this doesn't work: if a step is locked, finish the step before it.

Watch: Welcome and tour, the sidebar from 0:13

Full guide section: Overview

Related: What is Rate Studio, and what is it not? | Take a quick tour of Rate Studio | What is the Budget Module, and when do I use it?