An MSOH pool needs a base. If you turn MSOH on and route nothing to it, Rate Studio warns you.
Costs recorded as MSOH default to G&A, or you can treat them as overhead in one of the structure's pools. If MSOH accounts remain in your data, a red message may appear (see 'Cost data not used by this structure' red message).
If this doesn't work: see Should I use an MSOH pool? for how MSOH works.
Watch: MSOH and G&A, routing and optional elements from 1:06
Full guide section: Configure Structures
Related: How do I route materials, subcontracts, travel and ODC? | Should I use an MSOH pool? | 'Cost data not used by this structure' red message