How do intermediate pools and allocation drivers work?

How do intermediate pools and allocation drivers work?

An intermediate pool is a pure allocation vehicle. It collects its own costs, such as facilities, IT or HR, and passes them to the pools that use them. It never allocates straight into a base.

How to set them up

  1. On Configure Structures, open the Intermediate card.
  2. Select the pools this structure needs, or add a custom pool. Leave the card empty if you have none. Your plan sets how many you can use (see What are my plan limits? (tiers vs. editions)).
  3. Choose each pool's allocation base, also called a driver. Rate Studio recommends one: square footage for facilities and headcount for IT. You can choose an alternative, but it must be applied consistently and documented.
  4. If one intermediate pool charges another, set the feed order. See What is feed order, and why can't pools feed each other in a circle?.

How the cost flows

The allocated cost reaches each recipient pool as an applied cost line, the same way applied fringe does. The driver data, such as square footage for each recipient pool, is entered when you enter cost data (see How do I enter intermediate pool allocation data?). The Data Requirements screen shows what is needed.

If this doesn't work: if the calculation stops with a circular feed message, see Circular feed error between intermediate pools.

Watch: Fringe and intermediate pools, from 1:43

Full guide section: Configure Structures

Related: What is feed order, and why can't pools feed each other in a circle? | Circular feed error between intermediate pools | How do I enter intermediate pool allocation data?