How do I create a What-If?

How do I create a What-If?

A What-If layers dollar changes on top of your Baseline without touching your cost data. The structure is locked, and only the dollars can change.

Before you start

Enter your cost data as you normally would. The What-If starts from your Baseline, and in Perform a What-If Analysis mode it is an exact copy of the Baseline structure.

Steps

  1. On the What-If step, choose the What-If structure at the top. Your Baseline stays exactly as it is. Each structure can carry its own adjustments.
  2. For a labor change, such as a new hire, choose Add labor adjustment. Set the reason (for example New hire), choose the labor type and the pool it belongs to, and enter the annual amount. The Fringe impact column shows the fringe Rate Studio adds, using your own fringe rate. A salary increase works the same way, and you can also move labor between pools.
  3. For a cost change, such as a new subcontract, choose Add expense adjustment. Pick the cost (direct materials, subcontracts, travel, other direct costs or a pool expense) and enter the amount. Expenses carry no fringe, because only labor does.
  4. Continue to Calculate & Reconcile to see the result (see How do I read What-If results?).

Good to know

An adjustment is one change in dollars. Adjustments sit on top of your actual cost data, and you can remove one or all of them at any time. The tab shows how many adjustments each structure carries.

If this doesn't work: if the What-If step is unavailable, see A mode or option is unavailable on my plan.

Watch: Create a What-If, from 0:28

Full guide section: Mode & Purpose (the guide does not yet describe What-If adjustments in detail)

Related: How do I read What-If results? | Which mode should I use: Single Set, What-If, or Multiple Structures? | How do I add alternative structures to compare?