A What-If layers dollar changes on top of your Baseline without touching your cost data. The structure is locked, and only the dollars can change.
Enter your cost data as you normally would. The What-If starts from your Baseline, and in Perform a What-If Analysis mode it is an exact copy of the Baseline structure.
An adjustment is one change in dollars. Adjustments sit on top of your actual cost data, and you can remove one or all of them at any time. The tab shows how many adjustments each structure carries.
If this doesn't work: if the What-If step is unavailable, see A mode or option is unavailable on my plan.
Watch: Create a What-If, from 0:28
Full guide section: Mode & Purpose (the guide does not yet describe What-If adjustments in detail)
Related: How do I read What-If results? | Which mode should I use: Single Set, What-If, or Multiple Structures? | How do I add alternative structures to compare?